The Tech Lead Handbook · The Tech Lead Role
Coding vs Leading: Where Your Time Goes
How much a tech lead should code, which work to keep and which to give away, with a small model of how a lead's time disappears.
Scenario
Example team: Priya (from What a Tech Lead Owns) agreed her scope with her manager. Two months later she still carries a full sprint of tickets, plus reviews, design questions, interviews and incident follow-ups. Her tickets are always the last to finish.
What you see on the team
- The sprint board shows the lead's tickets "in progress" for a week or more.
- Critical-path work waits on her; she becomes the reason the sprint slips.
- Reviews and design answers happen late in the evening, in a rush.
- She feels guilty about meetings because "real work" is coding.
The common mistake
Keeping a full individual workload and doing leadership "on the side" — or the opposite, stopping coding entirely and losing touch with the code base.
Why it happens
Leadership work is fragmented and invisible: a review here, a question there, a meeting. It never appears on the board, so it never gets capacity, and the lead's coding time is quietly consumed. The simulation below models a week.
HOURS = 40
# Hours per week spent on leadership work (example numbers for a team of 7)
leadership = {
"code reviews (7 people)": 6,
"design questions / pairing": 5,
"planning, refinement, standup": 4,
"incidents and on-call follow-up": 3,
"1:1s with manager and product": 2,
"interviews": 3,
"cross-team syncs": 3,
}
used = sum(leadership.values())
coding = HOURS - used
for task, h in leadership.items():
print(f"{task:34} {h:>2} h")
print(f"{'leadership total':34} {used:>2} h")
print(f"{'left for coding':34} {coding:>2} h ({coding / HOURS:.0%} of the week)")
# A full sprint of tickets assumes ~30 focused hours.
planned = 30
print(f"\nPlanned ticket work: {planned} h -> share finished this week: {min(1, coding / planned):.0%}")
Output
code reviews (7 people) 6 h design questions / pairing 5 h planning, refinement, standup 4 h incidents and on-call follow-up 3 h 1:1s with manager and product 2 h interviews 3 h cross-team syncs 3 h leadership total 26 h left for coding 14 h (35% of the week) Planned ticket work: 30 h -> share finished this week: 47%
Twenty-six hours of leadership work leave fourteen for coding — and those fourteen are fragmented. Planning a full sprint of tickets for the lead guarantees they slip.
The playbook
Plan the lead at ~30–50% coding capacity and make the leadership work visible: put "reviews", "design support" and "interviews" on the board or in planning as capacity.
Keep work that keeps you close to the code but off the critical path:
- spikes and prototypes for upcoming designs;
- tooling and developer-experience fixes;
- pairing on hard problems, with someone else as the driver;
- small, well-bounded tickets that can wait a day.
Give away work that creates bottlenecks:
- the riskiest critical-path ticket (delegate it with support — see Mentoring and Delegation);
- sole ownership of a subsystem;
- being the only reviewer for an area.
Batch interruptions. Review twice a day; hold "office hours" for design questions; protect two half-days a week for deep work.
What to say
In sprint planning:
"I'm going to plan myself at 40% this sprint — the rest is reviews, the payments design and two interview loops. I'll take the reporting script and the flaky-test fix; Ana, can you own the refund API change? I'll pair with you on the ledger part."
Trade-offs
- Too little coding erodes judgement and credibility; keep at least some regular hands-on work, even if it's tooling or prototypes.
- Office hours can slow urgent questions; keep an escape hatch for real blockers.
- Delegating the hard ticket costs time now (support, review) and pays back as team capability.
Signals it's working
- The lead's tickets finish within the sprint; none are on the critical path.
- Review latency is stable even in weeks with interviews.
- Others own and deliver the risky tickets, with the lead pairing.
- The lead still knows the code well enough to review designs credibly.
Key points
- Leadership work is real work: plan it as capacity, not as overhead on top of a full sprint.
- Plan a tech lead at roughly 30–50% coding, on work that keeps them close to the code but off the critical path.
- Delegate critical-path tickets with support; batch reviews and questions.
- Never stop coding entirely — keep prototypes, tooling or pairing.
Practice questions
Your tech lead's tickets always finish last. What do you change in planning?
Answer
Plan their capacity at 30–50% coding, make reviews, design support and interviews visible as capacity, and assign them work off the critical path (prototypes, tooling, small tickets) while others own the critical-path items with the lead pairing.
Which work should a tech lead keep, and which should they give away?
Answer
Keep: prototypes and spikes, tooling, pairing as navigator, small non-urgent tickets. Give away: the riskiest critical-path ticket (with support), sole ownership of a subsystem, being the only reviewer of an area.
Why is stopping coding completely a risk for a tech lead?
Answer
They lose context on the code base and tooling, their design reviews become less grounded, and their credibility with the team drops. Keeping regular small hands-on work avoids this without blocking delivery.