The Engineering Manager Handbook (Development Manager) · Capstone Case Studies
Capstone: Take Over a Struggling Team
You inherit a team with slow delivery, high attrition and low trust. Diagnose, plan your first 90 days and set measurable goals.
Scenario
Example company: you join as engineering manager (the role is titled Development Manager) of the orders team: nine engineers, one tech lead, after the previous manager left suddenly.
Evidence
- Delivery: median change lead time 9 days (organisation median 2); deploys once a week on Thursdays; change fail rate 28%.
- Incidents: 14 in the last quarter; postmortems exist for 3.
- People: 3 regretted departures in 12 months; engagement survey 52% favourable (organisation 71%); lowest items "I know what is expected of me" and "My work is recognised".
- Process: sprints planned at 100% nominal capacity; carry-over ~50%; 1:1s "when needed".
- Relationships: product calls the team "unreliable"; the tech lead is burned out and covers on-call most weeks.
- Your director's ask: "Fix delivery this quarter."
Deliverables
- Your diagnosis: the main problems and how they connect.
- Your 90-day plan, by month.
- Three to five measurable goals for six months, and how you'll report them.
- How you'll handle the tech lead, product, and your director's expectations.
Hints
- Which problems are causes and which are symptoms?
- What do the two lowest survey items tell you?
- Is "fix delivery this quarter" realistic — and what would you offer instead?
Draft each deliverable below before revealing the model answer and rubric.
Further reading: DORA metrics · Understand team effectiveness
Deliverables
Diagnose the main problems and how they connect.
Model answer
- Large, infrequent, risky releases: weekly deploys and 9-day lead time make each release big, so the change fail rate is high and incidents frequent.
- Incidents without learning: few postmortems, so the same problems recur.
- Overload: 100% planning plus incidents gives 50% carry-over and an "unreliable" reputation.
- People system missing: irregular 1:1s, unclear expectations, little recognition (survey items) — consistent with attrition.
- Single point of failure: the tech lead carries on-call and is burning out. These reinforce each other: incidents eat capacity, overload drives attrition, attrition reduces capacity.
Rubric
Look for: linking delivery, quality and people problems into a system, and separating causes from symptoms. Misses: treating 'slow delivery' as the root problem or blaming the team.
Your 90-day plan.
Model answer
- Month 1: weekly 1:1s with everyone (same questions), meet product and stakeholders, review incidents and data; immediately share on-call fairly (a rotation) to protect the tech lead; start postmortems for every significant incident.
- Month 2: share a "what I heard" summary; plan to real capacity; introduce small, frequent deploys (daily target) with the tech lead; write role expectations from the career ladder for each person.
- Month 3: agree 6-month goals with the director and product; start monthly delivery and health reviews; recognise wins publicly; career conversations with everyone.
Rubric
Look for: listening first but acting immediately on safety and burnout; sequencing people and delivery fixes; involving the team. Misses: big reorganisations in month one, or waiting three months to act on the tech lead's overload.
Three to five measurable goals for six months.
Model answer
- Median change lead time 9 → 3 days; deploy frequency weekly → daily.
- Change fail rate 28% → under 15%; postmortems for 100% of significant incidents, with actions tracked.
- Planned vs done ≥ 80% for three consecutive sprints.
- Engagement: "I know what is expected of me" and "My work is recognised" up 15 points.
- No regretted departures in the period; on-call load spread across at least six engineers. Report monthly to the director and product with trends and what's being changed.
Rubric
Look for: goals covering delivery, quality, predictability and people, with baselines and targets, and a reporting rhythm. Misses: only delivery goals, or goals without baselines.
How do you handle the tech lead, product and your director?
Model answer
- Tech lead: in week one, take them off default on-call and agree a fair rotation; ask what they need; agree the tech lead/manager split of responsibilities; give them ownership of the deploy-frequency work.
- Product: acknowledge the reliability problem, agree planning to real capacity and weekly written updates, and involve them in the 6-month goals.
- Director: reframe "fix delivery this quarter" as visible progress this quarter (rotation, postmortems, planning accuracy, first lead-time gains) and the full improvement over six months, with monthly reporting.
Rubric
Look for: protecting the person at risk immediately, rebuilding trust with product through predictability and transparency, and managing up with a realistic, measured plan. Misses: promising a one-quarter turnaround.