What is an error budget, and how should it be used?
Summary
The error budget is the amount of unreliability an SLO allows: with a 99.9% availability SLO over 30 days, 0.1% of requests (or about 43 minutes of full downtime) may fail. While budget remains, teams can ship and take risks; when it is spent, the agreed policy shifts effort to reliability.
Longer Answer
The budget turns the reliability-versus-velocity argument into data: both product and engineering agree on the SLO, so spending the budget on launches is legitimate, and exhausting it triggers a pre-agreed response rather than a negotiation.
An error budget policy typically says: if the budget is exhausted over the window, freeze non-critical releases (except fixes), prioritise postmortem action items, and require extra review for risky changes until the service is back within SLO. It also says what happens when a single incident consumes a large share (for example 20%): mandatory postmortem. A budget that is never spent can mean the SLO is too loose or the team is too cautious.
Key Points
- Budget = 1 - SLO.
- Spend it on velocity; protect it with a policy.
- Policy agreed in advance.
- Unspent budget is a signal too.
Explanation
What interviewers look for
The candidate explains the policy and the cultural point: the budget aligns product and engineering.
Follow-up questions
- What would you do if product wants to ship during a budget freeze?
More most-asked Site Reliability Engineering questions
- What is Site Reliability Engineering, and how does it relate to DevOps?
- What is the difference between monitoring and observability? Explain metrics, logs and traces.
- Define SLI, SLO and SLA, and explain how they relate.
- What is burn-rate alerting, and why is it better than alerting on raw error rates?
- How do you choose good SLIs for a service?
- What are the four golden signals?
- What makes a good alert? Explain symptom-based alerting and alert fatigue.
- How should incident response be organised? Describe the key roles.