Summary

Right-size requests from real usage (requests drive node count), use autoscaling at both the pod and node level, bin-pack with tools such as Karpenter consolidation, run interruption-tolerant workloads on spot or preemptible nodes, scale non-production environments down outside working hours, and allocate costs per team with labels and tools such as OpenCost or Kubecost.

Longer Answer

Over-requesting is the biggest waste: pods requesting 2 CPU and using 0.2 keep nodes half empty. Other wins: ARM-based nodes where images support them, removing orphaned volumes and load balancers, limiting log and metric volume, and avoiding one cloud load balancer per Service. Measure before and after, and keep reliability headroom.

Key Points

  • Right-size requests.
  • Autoscale pods and nodes; consolidate.
  • Spot for tolerant workloads; schedule non-prod down.
  • Cost allocation by labels (OpenCost).